1. Pre-Installation Inbuatsaihna
Slewing drive an install hmain personnel te chuan device hi taksa lama chhiatna a awm leh awm loh an enfiah hmasa tur a ni. Slewing reducer leh connecting bracket te chu tifai rawh. Supporting surface atang hian bawlhhlawh, iron filings, paint, burrs, leh welding slag te chu paih chhuak rawh. Mounting surface atanga anti-rust oil lakchhuah nan diesel emaw gasoline ang chi cleaning fluid hmang la, rubber seal te chu tihchhiat loh nan fimkhur rawh.
2. Bolt dahna tur
Installation-a bolt hman turte chu specification leh performance grade dik tak a ni tur a ni a, a tlangpuiin 10.9 aia tlem lo a ni tur a ni. Bolt-ah hian washer \\ha tak tak dah tur a ni a, mounting surface pawnah a chhuak tur a ni lo. Screw hole chhunga bolt threaded te sei zawng hi a tlangpuiin nominal bolt diameter aiin a let hnih a ni. Factory-a dah bolt te hi shipping bolt an ni a; lakchhuah hnuah locating bolt te chu preload dik tak hmangin secure rawh.
3. Slewing Drive mount dan tur
Bolt lu-ah washer dah la, bracket leh drive chu bolt hmangin no-load conditions. 4. Installation Precautions hnuaiah secure rawh
Bolt leh washer te chu pre-tighten hmasa phawt ang che. Flat washer emaw spring washer emaw hi hman a ni tlangpui. Crosswise-in khauh takin khih la, bolt thread-ah hian thread-locking glue hnawih rawh. Bolt zawng zawng chu a inmil vek tih enfiah la, pakhat mah hloh suh. Bolt sei lutuk leh thread sei zawng nena inmil lo chu pumpelh rawh. Bolt leh joint khauh tak takte chu a hnua enfiah a nih theih nan mark rawh. Installation zawhah finish chu repaint la, rust leh corrosion resistance a ti tha zawk ang.




